homegraphicNewsContact Us
BEN Logomain photo

Case Studies

Project Photo
Cat 4 & 6

Project: Reverse Osmosis Water Treatment Facility
Client: Omoflow
When: March 2007
Description: The scope of works required B.E.N. to take possession of the completed Reverse Osmosis skid, install the skid, including the associated equipment and pipe work. Exotic materials were used and the site duration was 6 weeks. On completion of the installation we were contracted to provide commissioning services.

Project Photo
Cat 4

Project: Relocation of Mine Site
Client: Doral Mineral Sands
When: June 2007
Description: Over some 3 months we assisted our client to plan the logistics of the complete relocation of their mine site to its new location some 1.2 km's away.
The actual relocation was done over a 3 week period. It included the relocation of conveyors, tanks, structures and the associated equipment.

Project Photo
Cat 2

Project: Hitachi Excavators
Client: HEW Mining
Description: Machining of boom bushes for heavy equipment is done on an on-going basis.

Project Photo
Cat 3, 4 & 7

Project: Char loading hopper
Client: Premier Coal
When: May 2007
Description: Manufacture, surface treatment and the installation of a hopper for the bagging of Char.

Project Photo
Cat 3, 4 & 5

Project: Re-build of a Double Deck Screen
Client: Doral Minerals
When: April 2009
Description: Doral Minerals contacted us with a major break down of this integral piece of equipment. The screen was removed from site, transported to our manufacturing facilities, disassembled and one complete side was replaced with a new rebuilt side. We were on site some 15 hours later to reinstall the screen and got our client back into production.

Project Legend:

Cat 1: denotes Eng & Detailing
Cat 2: denotes Pre Machining
Cat 3: denotes Fabrication
Cat 4: denotes Onsite Maintenance

Cat 5: denotes Emergency Call Out Service
Cat 6: denotes Pipe work and Special Welding
Cat 7: denotes Surface Treatment

image