Case Studies
Project: Drier Expansion Bellows
Client: Ravensthorpe Nickel
When: June 2008
Description: Manufactured / repaired expansion bellows after a emergency call out.
Project: Slurry Pump Shaft
Client: Weir Minerals
When: ongoing
Description: Manufacturing/ machining “Warman”pump shafts (under licence).
Project: Worsley Co-generation Power Plant
Client: Austrian Energy
When: July 2009
Description: Manufacture of conveyor chutes for the materials handling system. Chutes were manufactured from grade 250 and 3CR12 plate.
Project: Drum Drier Feed System
Client: Tiwest
When: October 2009
Description: Manufacture, machining and the assembly of the complete system including the testing of the completed unit. All components are manufactured from 316 grade stainless steel and the completed unit had an electro-polish finish.
Project: Mineral Sands
Client: RCR Rubber
When: Ongoing
Description: Agitator repairs included replacing paddles due to general high wear that they a subjected too.
Project Legend:
Cat 1: denotes Eng & Detailing
Cat 2: denotes Pre Machining
Cat 3: denotes Fabrication
Cat 4: denotes Onsite Maintenance
Cat 5: denotes Emergency Call Out Service
Cat 6: denotes Pipe work and Special Welding
Cat 7: denotes Surface Treatment