Case Studies
Project: Warman Bowl Pump Repairs
Client: Weir Minerals
When: Ongoing
Description: Bowl pump end casing was subjected to heavy wear on the main bore. The parent material was cast iron an up to 100mm was repaired using a 309 flux core welding wire.
Project: Pipe Spooling
Client: Worley Parsons
When: March 2008
Description: 321 stainless steel pipe spooling.
Project: Feed Boxes
Client: Dwyer Engineering
When: 2008
Description: Manufacture of feed boxes from 250 grade mild steel. Fabrication is not only carried out direct for the end user, but also for other engineering companies. This project is an example of the local industry working together using the local network of South West companies to service local companies.
Project: Ship Bulkhead Repairs
Client:
When: 2009
Description: A ship had a damaged bulkhead that had to be repaired prior to sailing. We received the call and had a team mobilised within 30 minutes to carry out the repairs. The work was done overnight allowing the ship to sail the following morning. NDT was carried out on all welds.
Project:
Client: West Char
When: 2008
Description: Site measuring, detailing, manufacture and the installation of pipe spooling complete with lobster back segmented bends.
Project Legend:
Cat 1: denotes Eng & Detailing
Cat 2: denotes Pre Machining
Cat 3: denotes Fabrication
Cat 4: denotes Onsite Maintenance
Cat 5: denotes Emergency Call Out Service
Cat 6: denotes Pipe work and Special Welding
Cat 7: denotes Surface Treatment